ECSU Dorms 1, 2 & 3

The Architectural Precast Concrete used throughout the three buildings compliment the traditional cast stone used on existing campus buildings.

As a solution, the entrance tower for this building incorporated structural design resulting in a total precast concrete constructed area interfacing with the traditional masonry construction of the building. This change was made early in construction which eliminated steel and masonry trades while still creating a dramatic visual effect.

Another successful project incorporating the structural and architectural properties of precast concrete.

Project Details

Street:

50 Windham Road
 

City:

Willimatic
 

State:

CT
 

Year:

2005
 

Architect:

Add Inc., Cambridge, MA
 

Engineer:

BVH Integrated Services, Bloomfield, CT
 

General Contractor:

Perini Building Company, Framingham, MA
 

Sq. Footage:

11,978 SF
 

Levels/Floors:

5
 