General Electric

GE Healthcare Division's new 225,000 SF facility for the manufacturing of components for their digital X-Ray and MRI equipment in North Greenbush will feature a dramatic, curved glass and precast concrete entrance anchoring a two story manufacturing structure.

This specialty Office and Class 100 Cleanroom Building is one of the first of its type in the U.S. to be designed as a LEED® Gold project. The building also includes 40,000 SF of Class A office space, a showroom for product display, a café/kitchen, health clinic, fitness center, laboratories, high security lobby/control station, and more.

Precast installation started in September, 2008 and finished in November 2008.

The project featured:
• 52,271 square feet of wall panels
• 63 CarbonCast wall panels (6-inch and 10-inch thick)
• Sun screen columns
• Wall panels in heights ranging up to 37 feet and featuring two levels of sandblast (light and heavy).

Prev
1
2
 

Project Details

City:

North Greenbush
 

State:

NY
 

Year:

2009
 

Owner:

General Electric Healthcare Fairfield, CT
 

Architect:

SMRT Inc, Troy, NY
 

Engineer:

Turner Group Albany, NY
 

General Contractor:

Turner Construction Albany, NY
 

Sq. Footage:

225,000 (Manufacturing)
40,000 (Office - Class A)
 

Levels/Floors:

2
 

Structural Precast Elements:

• 52,271 sf wall panels
• 63 CarbonCast wall panels (6-inch and 10-inch thick)
• Sunscreen columns
• Wall panels in heights ranging up to 37 ft
 

Color:

• Two levels of sandblast (light and heavy
 